Meta announces its first data center in Canada — estimated $9 billion 1GW Alberta mega facility sees the AI expansion cross the border
Meta is crossing the border to build a data center in Alberta, Canada The data center will have a 1GW capacity and cost $9 billion to build It will eventually lead to 300 operational jobs, Meta says Meta has announced its ambition to build a $9 billion datacenter in Alberta, Canada, with a 1GW capacity. The project, which was announced in a Meta blog post , is set to be built just outside of Edmonton in Sturgeon County, with the construction expected to take two to three years. Meta says the data center will support around 3,000 jobs during construction, and then 300 operation jobs when the data center is up and running. 1GW AI-optimized data center Alongside the data center, Meta has announced that it will improve local infrastructure with a CAD $60 million in roads and water services. The project will also see its electricity usage matched with “100% clean and renewable energy,” with the full ...